Building India's
Infrastructure Future
Delivering world-class infrastructure projects across India with innovation, precision, and commitment to excellence.
Projects Portfolio
20 projects found
Highway Construction, Tumkur
Construction of New Broad Gauge line between Chainage 66400 & Chainage 90000(23.600 km) including Civil & Track works, Signal & Telecommunication works,Railway Electrification and Electrical General Services between Tavarekere (excl.) &Hiriyur (excl.) Stations in Tumkur-Chitradurga-Davangere new line project
NH-46 Project, Madhya Pradesh
Design and Construction of Flyover/VUP/LVUP at 04 locations for permanent rectification of MoRT&H identified Blackspot locations i.e, CRPF camp (Shivpuri Bypass End Point) & Mohrai Tiraha on NH-46, Cut Point Shivpuri Link Road Karai Dada & Teela Road College Tiraha, Karera on NH-27 in the State of Madhya Pradesh on Engineering, Procurement and Construction (EPC) Mode
NH-34 Project, Hathras
4laning of Agra Aligarh Sec from Km.0.000 (junc of NH34 Aligarh)to Km.28.000(near Asroi vill in Hathras)in UP on HAM mode under NH(O)Scheme (PKG-I)
Construction of new Broad gauge line Between chainage 25.400
Construction of new Broad gauge line Between chainage 25.400 & Chainage 66.400 (41.000 km) Including electrical, Signal & telecommunication, Works betweenThimmarajanahalli (excl.)& Tavarekere (incl.) Stations In Tumkur-Chitradurga-Davangere project
Highway Construction, Ajmer
Earth work in bank/cutting including Blanketing, Construction of Minor Bridges, RUB/LHS, FOB, Trolley refuges, Toe wall, Retaining wall, Pitching, Station buildings and Other structures, Platform, Platform sheds, Staff Quarters and other ancillary works from Singawal (Excluding) to RailaRoad (Including) between km 53/3 to km 99/0 in connection with Doubling of Ajmer-Chanderiya in Ajmer division of North Western Railway.
Highway Construction, Ajmer
Earth work in bank/cutting including Blanketing, Construction of Minor Bridges, RUB/LHS, FOB, Trolley refuges, Toe wall, Retaining wall, Pitching, Station buildings and Other structures, Platform, Platform sheds, Staff Quarters and other ancillary works from Adarsh Nagar(Including) to Singawal (Including) between Km 4/6 to 53/3 in connection with Doubling of Ajmer-Chanderiya in Ajmer division of North Western Railway.
Highway Project Km 0.000 to Km. 69.280 of NH-931, Uttar Pradesh
Rehabilitation and Up-gradation from design Km 0.000 to Km. 69.280 of NH-931 (Pratapgarh - Amethi - Gauriganj - Musafirkhana) to two lane with paved shoulder on Engineering, Procurement and Construction (EPC) mode in the State of Uttar Pradesh.
Highway Construction, Filling
Earth Work in Filling, Cutting, Mechanical Compaction, Turfing, Provision of Blanketing, Construction of Minor Bridges, Shifting of CI/DI Water main Pipe Line, Construction of Retaining Wall, Drain and other allied works between Chainage 1300 to 7950 (Except Bridge No 31 and 32-A & Mandawali Railway Station) in C/W 3rd & 4th Line between Tilak Bridge and Anand vihar Railway Station
NH-49 Project, Baharagora
Cons. of 8 nos of Elephant Underpasses1 no. of Vehicular Underpass1 nos. of Light Vehicular Underpass1 nos. of Pedestrian Underpass1 nos of FOB and A2 side approach of Jharpokharia Flyover at km.215.270 in Baharagora- Singhara of NH49 in Odisha
Strengthening Major Maintenance work of Chhindwara Soaner Se
Strengthening Major Maintenance work of Chhindwara Soaner Sec and Chhindwara ring Rd 133.222 km, Chhindwara Amarwara Narsinghpur Sec 113.000 km, Chhindwara Multai and Sonakhar Seoni sec 136.877 km of NH347 and NH547 in MP and Maharashtra on EPC
NH-354 Project, Punjab
Rehabilitation and augmentation of New NH-354 of section Amritsar (airport junction) to Ramdas from Design Chainage km ASR 100.835 to Design Chainage km 139.813 for Length of 38.978 km into Four-Lane under Bharatmala scheme in the State of Punjab (Package-IV) under EPC Mode
Highway Upgradation, Punjab
4 Laning of Amritsar Bypass GA from New Tarn Taran Road-Ajnala Road from km 0.750-km.43.750 and Upgradation of existing Amritsar-Khemkaran Road to 4-Lane Config from Design km.71.496-km.78.440 Total 49.944 kms PKG-3 in Punjab under BMP on EPC mode
CONSTRUCTION AND UPGRADATION OF DITTE DIMME-MIGGING ROAD (DE
CONSTRUCTION AND UPGRADATION OF DITTE DIMME-MIGGING ROAD (DESIGN CHAINAGE FROM KM 104.53 TO KM 129.31 AND EXISTING CHAINAGE FROM KM 113.65 TO KM 142.0) TO 2-LANE WITH HARD SHOULDERS UNDER PROJECT BRAHMANK IN THE STATE OF ARUNACHAL PRADESH ON EPC MODE (PACK-2
CONSTRUCTION AND UPGRADATION OF DITTE DIMME-MIGGING ROAD (DE
CONSTRUCTION AND UPGRADATION OF DITTE DIMME-MIGGING ROAD (DESIGN CHAINAGE FROM KM 152.81 TO KM 173.34 AND EXISTING CHAINAGE FROM KM 167.10 TO KM 189.1) TO 2-LANE WITH HARD SHOULDERS UNDER PROJECT BRAHMANK IN THE STATE OF ARUNACHAL PRADESH ON EPC MODE (PKG-IV)
NH-44 Project, Punjab
Construction of 3-lane new ROB at existing km 373+230 (design chainages 0+440) including widening, construction of VUP at existing km 373+190 (design chainages 0+400) & ramps at LHS & RHS and merging of alignment with PAP flyover at km 372+500 (design chainages 0+710) on Panipat Jalandhar Section of NH-44 (old NH- 01) in the State of Punjab on EPC basis
CONSTRUCTION AND UPGRADATION OF DITTE DIMME-MIGGING ROAD (DE
CONSTRUCTION AND UPGRADATION OF DITTE DIMME-MIGGING ROAD (DESIGN CHAINAGE FROM KM 129.31 TO KM 152.81 AND EXISTING CHAINAGE FROM KM 142.02 TO KM 167.1) TO 2-LANE WITH HARD SHOULDERS UNDER PROJECT BRAHMANK IN THE STATE OF ARUNACHAL PRADESH ON EPC MODE pack-3
Highway Project Km 100.757-107.350, Madhya Pradesh
4-laning from Km 100.757 to Km 107.350 Section of Gwalior-Shivpuri (NH-03) passing through Madhav National Park in the State of Madhya Pradesh on EPC Mode
Highway Project Km 67+000-99+000, Gujarat
Construction of 6- Lane access controlled Greenfield highway from km 67+000 to km 99+000 of Rajasthan/Gujarat Border to Santalpur section of NH-754K as a part of Amritsar-Jamnagar Economic Corridor in the State of Gujarat on EPC mode under Bharatmala Pariyojana (Phase-I) (AJ/RGBS-Package- 3)
Dembuen to Bruni
Construction of High Altitude Hill Road from Dembuen TO Bruni from KM 0.000 to KM 36.300 in Anini District of the state of Arunachal Pradesh on EPC Mode
Highway Project Km 16.380-19.785, Uttarakhand
Development of Six lane access controlled highway of Daat kali Tunnel Dehradun of Ganeshpur Dehradun section of NH72A from km 16.380 to km 19.785 Design Chainage in Uttarakhand under Bharatmala Pariyojana on EPC mode Package3